News :
June 10 2013
Aledia powers ahead at light(n)ing speed
- Industry
- MINATEC
- News
- Research
Aledia, a start-up spun off from Leti, has just crossed two important milestones. First, it has finished making its first series of LEDs on 200 mm silicon wafers—a breakthrough process that cuts LED production costs by a factor of four relative to conventional methods. And second, the young firm has raised €10 million of fresh […] >>
June 10 2013
MEIS looks at nanowire constraints
- MINATEC
- News
- Research
MEIS, or medium-energy ion scattering, off ers very-high-resolution chemical and structural surface analysis capabilities. The technique works by analyzing the energy and angle of backscattered ions, and is frequently used for fl at layers. A team of researchers from INAC and Leti recently came up with an innovation when they used MEIS to study the […] >>
June 10 2013
Leti Innovation Days brings together businesses and researchers
- Industry
- Life @ MINATEC
- MINATEC
- News
- Research
Leti’s annual gathering will be held at MINATEC on June 25–28—with one big novelty: this will be the first year of the new format, beefed up considerably relative to the Leti Annual Review. This first edition of the Leti Innovation Days will include a full program of talks and workshops on technical topics. The central […] >>
June 10 2013
Leti sets the stage for 14 nm FDSOI
- MINATEC
- News
- Research
The first 14 nm microelectronic circuits won’t be produced on a large scale until 2015 or 2016—but now is when engineers need to decide which technologies they want to use. That’s why Leti has just put together a 14 nm design kit for one of its flagship technologies: fully-depleted silicon on insulator (FDSOI). The kit […] >>
June 10 2013
MINATEC gets €150 million worth of new buildings
- Events
- Life @ MINATEC
- MINATEC
- News
With €150 million of building construction projects planned or underway, MINATEC is undergoing a major expansion—its biggest leap forward since it was established in 2002. The Nanobio2 building (1,400 m2 of useable space) will be inaugurated in just a few weeks. Construction has begun on the Phelma II building (8,500 m2 of gross floor area) […] >>